Who We Are: Leader in Mechanized Coal Mining

Tabas, the largest coking coalfield in Iran

Tabas coalfield, extended over 30,000km2 at southwest of the city, with an explored deposit of 2.75 billion tons of thermal and coking coal, is the biggest colliery in Iran.

Approximately 76% of the whole coal deposits of Iran, is placed in Tabas.

Parvadeh area with an extent of 1200km2, has a geological deposit of 1.1 billion tons is the largest coalfield in Iran.

The first phase of Tabas Parvadeh project was introduced and started targeting 1.5 million tons of raw coal per annum to produce 750,000 tons of clean coal.

Tabas Parvadeh Coal Company (TPCCO) as the first operator of the fully mechanized underground coal mines in Iran, started Longwall mining operation in Parvadeh I mine and simultaneously, started the largest Coal Preparation Plant (CPP) of the country, adjacent to the mine, with a feed capacity of 300 tons per hour and in the development plan of the coal processing plant, with the addition of spiral and TBS systems, the feeding capacity has increased to 360 tons per hour.

Coal is of clear importance, as a raw material for the mother steel industry, in Iran Vision Document

TPCCO as the largest company of the area and the biggest coal producer in Iran, while serves an influencing role in economic, social, industrial, mining, civil, educational, healthcare, cultural and sports development of the city and the province, has created more than 3200 stable job opportunities resulted in social growth and security and also, has rendered valuable services in these fields as his social responsibilities.

About 48% of the area and 29% of the country coal production, belong to TPCCO which supplies, on his own, a great demand of Iran’s coking industry, especially Esfahan Steel Company.

Eleven consecutive years on top rank of coal producers in Iran

TPCCO is honored to achievements such as

ISO 9001 Certificate of Quality Management

ISO 14001 Certificate of Environment

ISO 45001 Certificate of Safety and Professional Health

ISO 31000 Certificate of Risk Assessment

ISO 50001 Certificate of Energy Management System

Nominated entrepreneur

High HSE observations

Mines & Industries selected company

National mining selected company

Nominated client of the province

Best Cultural & Sports company of the province

Selected mining operator

Green Industry of the province and the country

Nominated exporter of the province

Biggest coal producer of the country for 11 consecutive years from 2014 to 2024

During 17 years of mechanized mining operations, TPCCO has completed more than 81500 meters underground tunneling, successfully excavated 9 Longwall panels, excavated more than 15.5 million tons of raw coal, and produced over 7.18 million tons of clean coal by the end of 2024.

In accordance with Article 44 of the Iranian Constitution, 100% of the company’s shares were privatized in 2014.

Sadr Tamin is the owner of the highest share of the total shares of TPCCO and is as the main shareholder of the company.

Capital Increase

First stage (2020), from 60 million to 500 billion IR Rials

Second stage (2020), from 500 to 2,000 billion IR Rials

Third stage (2022), from 2,000 to 3,500 billion IR Rials

Forth stage (2025),from 3,500 to 15,000 billion IR Rials.

Entering into the Capital Market

TPCCO shares, as the 229th symbol in exchange market, was listed as “Kezoghal” on 21 December 2020 in over-the-counter rates and the shares have been traded in the market since 3 February 2021, as the 177th company of the OTC market.

Development Plans

Planning to prepare the mine, produce and process the coal from new mining area in block VI and south area of Parvadeh IV with a deposit of 78 million tons and extraction of 500 thousand tons raw coal and 400 thousand tons of concentrate.

Performing explorations in new blocks of Parvadeh coalfield with the strategic objective of development and enhancing national coal production by 2028.

Following up purchasing the second set of mechanized Longwall equipment in order to diminish production downtimes due to overhaul and increase the production capacity of concentrate by 208 thousand tons

- Increasing the feeding capacity of the coal washing plant up to 600 tons per hour

Reverse Engineering

"To save foreign currencies and localize consumable and spare parts in mining and coal processing sectors, the following projects and initiatives are currently underway. These efforts leverage domestic engineering capabilities and are carried out in collaboration with Iranian companies:

- Standardization and reverse engineering of the dewatering centrifuge at the coal processing plant

- Manufacturing of 10 chain conveyors

- Domestic production of conveyor belts for underground coal mines

- Localization of control and signaling equipment used in coal mines

- Establishment of a manufacturing and localization engineering center for explosion-proof equipment used in underground coal mines

- Development of technical knowledge and technology for the desulfurization process of coal from Tabas mines

Main Objectives of the Company

Some, but not all, main objectives of the company towards excellence and development:

  • Maintain the top rank of coal production in the country
  • Maintain and develop the targeted internal and external markets
  • Ensuring continuous improvement of product quality
  • Maintain and improve the occupational health and safety level as well as the environment
  • Maintain and improve the satisfaction level of the internal and external beneficiaries
  • Maximize the profit and increase the intrinsic value of the shares
  • Improve the technical level and knowledge of the human resources

Tabas Parvadeh Coal Company